Recorded PCAB ID 16784
P.B. OBIAL CONSTRUCTION
Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.
- Project associations
- 36 Associations, not necessarily unique completed works
- Associated project budget
- ₱1,677,638,369.35 Not revenue, payment, or contract value received
- Joint-project associations
- 10
Recorded status mix
Projects by source status
- Completed
- 22
- Ongoing
- 14
- Terminated
- 0
PCAB verification snapshot
current regular
- Listed name
- P.B. OBIAL CONSTRUCTION
- Category
- A
- Valid to
- 2029-07-30
Recorded project ledger
Projects associated with this recorded identity
26 sole-project associations and 10 joint-project associations. 6 project associations currently have at least one deterministic review signal.
- Sole-project associated budget
- ₱758,344,776.40 Full project values for records naming only this party
- Joint-project associated budget
- ₱919,293,592.95 Full project values, not an allocation to this party
Loading structured project associations...
Contractor accountability
No strongly matched accountability event is published
A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.
Review leads
Signals associated with this contractor identity
- The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY - K1044+600 - K1045+581, K1045+603 - K1045+1048, K1045+1064 - K1046+300, K1046+900 - K1047+038, K1047+106 - K1049+000, K1049+300 - K1049+511, K1049+536 - K1052+1
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged - The recorded place may not matchSeveral projects use the same coordinates
What we noticed: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, MAYPANGDAN BR. (B00581SM), ALONG BORONGAN - GUIUAN ROAD
What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.
See why this was flagged - We do not have enough information yetThe record says completed, but this source has no satellite image
What we noticed: SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD WITH DRAINAGE FACILITIES, BARANGAY CANDUMAN, MANDAUE CITY
What this does not prove: A missing image does not prove that work was not completed.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DALAGUETE RIVER (DOWNSTREAM) AT BARANGAY POBLA
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0068+770 - K0069+755
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged
Concentration context
Groups where this was the leading recorded party
No published concentration group lists this contractor as the leading recorded party.