Archived contractor activity

Recorded PCAB ID 16916

FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO

Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
85
Associations, not necessarily unique completed works
Associated project budget
₱6,836,608,096.46
Not revenue, payment, or contract value received
Joint-project associations
1

Recorded status mix

Projects by source status

Completed
23
Ongoing
62
Terminated
0

PCAB verification snapshot

current regular

Listed name
FLORDES CONSTRUCTION AND TRADING CORP.
Category
AAA
Valid to
2027-08-27
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

84 sole-project associations and 1 joint-project association. 14 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱6,737,337,617.96
Full project values for records naming only this party
Joint-project associated budget
₱99,270,478.50
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

No strongly matched accountability event is published

A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.

Review leads

Signals associated with this contractor identity

  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD, SAN ILDEFONSO AND SAN MIGUEL (PACKAGE 1), PROVINCE OF BULACAN

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BY-PASS ROAD, SAN ILDEFONSO AND SAN MIGUEL (PACKAGE 3), PROVINCE OF BULACAN

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MANATAL, PANDI, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER, BARANGAY AKLE, SAN ILDEFONSO, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY MAYSANTOL, BULAKAN, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO (SITIO BUKID), CALUMPIT, BULACAN

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MASALASA CREEK, TARLAC CITY, TARLAC

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF CONCRETE SLOPE RIVER WALL ALONG ANGAT RIVER, BARANGAY TIAONG, BALIUAG, BULACAN

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF ROAD, BARANGAYS FRANCISCO HOMES YAKAL BARANGAY GUIJO, SAN JOSE DEL MONTE, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONSTRUCTION OF TEN (10) STOREY HPA ANNEX BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY, PHASE IV

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - TERTIARY ROADS-STA RITA-BIAK-NA-BATO VIA PULONG BAYABAS RD, SAN MIGUEL, BULACAN

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF HHSG PA ADMINISTRATION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY, PHASE II (RE-ADVERTISEMENT)

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONSTRUCTION OF HHSG PA ADMINISTRATION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY, PHASE II (RE-ADVERTISEMENT)

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONSTRUCTION OF 10-STOREY HPA ANNEXBUILDING WITH PARKING AREA AND GROUNDDEVELOPMENT, FBMM PHASE III, PACKAGE I

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONSTRUCTION OF MILITARY POLICE BATTALION ADMINISTRATION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY, PHASE III, PACKAGE II

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

No published concentration group lists this contractor as the leading recorded party.