Archived contractor activity

Recorded PCAB ID 21987

STEVEN CONSTRUCTION & SUPPLY

Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
41
Associations, not necessarily unique completed works
Associated project budget
₱2,901,610,775.87
Not revenue, payment, or contract value received
Joint-project associations
29

Recorded status mix

Projects by source status

Completed
16
Ongoing
25
Terminated
0

PCAB verification snapshot

current regular

Listed name
STEVEN CONSTRUCTION AND SUPPLY
Category
A
Valid to
2029-10-10
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

12 sole-project associations and 29 joint-project associations. 6 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱660,651,971.73
Full project values for records naming only this party
Joint-project associated budget
₱2,240,958,804.14
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

No strongly matched accountability event is published

A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.

Review leads

Signals associated with this contractor identity

  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: ROAD WIDENING - CAPIZ-AKLAN RD - K0331+003 - K0331+038, K0331+085 - K0333+020

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF SHORE PROTECTION STRUCTURE, BARANGAY LOWER OMON, RAGAY, CAMARINES SUR

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG COLACLING RIVER, BULAWAN JR., LUPI, CAMARINES SUR

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: 001;ASSET PRESERVATION PROG.-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MANGUIRING-TOMAGODTOD-SIBOBO ROAD-K0458+000-KO458+126.8,KO458+256.5-KO459+430 ,KO463+187-KO464+267 CALABANGA CAMARINES SUR

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL AT BRGY. OSIAO, BACON DISTRICT, SORSOGON

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CLUSTER 3-REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG STO. DOMINGO-BUHATAN-CAGRARAY CIRCUMFERENTIAL ROAD, STO. DOMINGO, ALBAY

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CLUSTER 3-REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG STO. DOMINGO-BUHATAN-CAGRARAY CIRCUMFERENTIAL ROAD, STO. DOMINGO, ALBAY

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

No published concentration group lists this contractor as the leading recorded party.