Archived contractor activity

Recorded PCAB ID 22540

VILLAR GENERAL CONSTRUCTION AND SUPPLIES

Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
78
Associations, not necessarily unique completed works
Associated project budget
₱3,050,178,088.43
Not revenue, payment, or contract value received
Joint-project associations
14

Recorded status mix

Projects by source status

Completed
46
Ongoing
32
Terminated
0

PCAB verification snapshot

current regular

Listed name
VILLAR GENERAL CONSTRUCTION AND SUPPLIES
Category
A / AAA / B
Valid to
2027-01-31
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

64 sole-project associations and 14 joint-project associations. 18 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱1,712,695,797.42
Full project values for records naming only this party
Joint-project associated budget
₱1,337,482,291.01
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

No strongly matched accountability event is published

A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.

Review leads

Signals associated with this contractor identity

  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MITURA RIVERS, ASINGAN, PANGASINAN (PACKAGE 1)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABULANDAYAN RIVER, SAN NICOLAS, PANGASINAN (PACKAGE 1)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABULANDAYAN RIVER, NATIVIDAD, PANGASINAN (PACKAGE 2)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABULANDAYAN RIVER, NATIVIDAD, PANGASINAN (PACKAGE 1)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, PACKAGE 5, BARANGAY ANDUYAN, TUBAO, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, PACKAGE 4, BARANGAY ANDUYAN, TUBAO, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, PACKAGE 2, BARANGAY ANDUYAN, TUBAO, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONST/IMPRVMNT OF ACCESS RDS LDNG TO TRADES, INDUSTRIES & ECONOMIC ZONES (RDS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG. - ROLL IT) SAN ANTONIO LNKNG TO NAG-BAGULIN RD LDNG TO SAN ANTONIO RICE WINE PRODUCTION, NAG. LU

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF ROAD, BRGY. ANGIN, NAGUILIAN, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF WATER SUPPLY SYSTEM, BRGY. BASCA, ARINGAY, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF BARANGAY HALL, BRGY. BAWANTA, BAUANG, LA UNION

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: BIP-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN, BRGY. HALOG WEST, TUBAO, LA UNION

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONST/MAINTENANCE OF FLOOD MIT STRUCTURES & DRAINAGE SYS.-CONST OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN BRGY. HALOG EST, TUBAO, LU (PACKAGE 7)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

No published concentration group lists this contractor as the leading recorded party.