Recorded PCAB ID 22679
JMLD CONSTRUCTION
Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.
- Project associations
- 18 Associations, not necessarily unique completed works
- Associated project budget
- ₱1,117,442,291.54 Not revenue, payment, or contract value received
- Joint-project associations
- 0
Recorded status mix
Projects by source status
- Completed
- 2
- Ongoing
- 14
- Terminated
- 0
PCAB verification snapshot
current regular
- Listed name
- JMLD CONSTRUCTION
- Category
- A / B / C
- Valid to
- 2027-02-27
Recorded project ledger
Projects associated with this recorded identity
18 sole-project associations and 0 joint-project associations. 6 project associations currently have at least one deterministic review signal.
- Sole-project associated budget
- ₱1,117,442,291.54 Full project values for records naming only this party
- Joint-project associated budget
- ₱0.00 Full project values, not an allocation to this party
Loading structured project associations...
Contractor accountability
No strongly matched accountability event is published
A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.
Review leads
Signals associated with this contractor identity
- The recorded place may not matchThe coordinates and place name may not agree
What we noticed: CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS
What this does not prove: Office and project labels can differ from map boundaries. This does not prove a false location.
See why this was flagged - The recorded place may not matchSeveral projects use the same coordinates
What we noticed: CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS
What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: CONSTRUCTION/REHABILITATION OF RAINWATER COLLECTORS SYSTEM (RWCS) IN PUBLIC FACILITIES 1) MALBONG ELEMENTARY SCHOOL, BRGY. MALBONG, GAINZA, CAMARINES SUR 2) CAGBUNGA ELEMENTARY SCHOOL, BRGY. CAGBUNGA, GAINZA, CAMARINES SUR 3) DAHILIG ELEMENTARY SCHOOL, BR
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE RAIN WATER COLLECTOR SYSTEM (RWCS)
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged - The recorded place may not matchSeveral projects use the same coordinates
What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 5, SAN ILDEFON
What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.
See why this was flagged - The recorded place may not matchSeveral projects use the same coordinates
What we noticed: CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CTRL. STRUCTURE ALONG ANYATAM-MAPANIQUE CREEK,PHASE 8,SAN ILDEFONSO,BUL.
What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.
See why this was flagged - The record disagrees with itselfThe project says ongoing, but progress says 100%
What we noticed: BASIC INFRASTRUCTURE PROGRAM-BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MARONQUILLO-PASONG BANGKAL ROAD, SAN RAFAEL, BULACAN
What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.
See why this was flagged
Concentration context
Groups where this was the leading recorded party
No published concentration group lists this contractor as the leading recorded party.