Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
34
Associations, not necessarily unique completed works
Associated project budget
₱3,529,025,033.81
Not revenue, payment, or contract value received
Joint-project associations
16

Recorded status mix

Projects by source status

Completed
14
Ongoing
20
Terminated
0

PCAB verification snapshot

current regular

Listed name
J. SIMEON CONSTRUCTION
Category
A
Valid to
2028-03-29
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

18 sole-project associations and 16 joint-project associations. 7 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱1,662,979,301.33
Full project values for records naming only this party
Joint-project associated budget
₱1,866,045,732.48
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

No strongly matched accountability event is published

A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.

Review leads

Signals associated with this contractor identity

  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 17), TAGUIG CITY

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 3), TAGUIG CITY

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MALITLIT WATERWAYS (NEAR RIVERBEND HOMES), STA. ROSA CITY, LAGUNA (PHASE 1)

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG ANGAT RIVER, BARANGAY CAMBAOG, BUSTOS, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTH LUZON EXPRESSWAY (SLEX) MALITLIT BRIDGE, STA. ROSA CITY, LAGUNA (PHASE II)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTH LUZON EXPRESSWAY (SLEX) MALITLIT BRIDGE, STA. ROSA CITY, LAGUNA (PHASE 1)

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 10), VALENZUELA CITY

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

No published concentration group lists this contractor as the leading recorded party.