Archived contractor activity

Recorded PCAB ID 37325

KING EIGHT BUILDERS AND SUPPLY

Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
31
Associations, not necessarily unique completed works
Associated project budget
₱1,567,526,332.22
Not revenue, payment, or contract value received
Joint-project associations
3

Recorded status mix

Projects by source status

Completed
14
Ongoing
16
Terminated
0

PCAB verification snapshot

current regular

Listed name
KING EIGHT BUILDERS AND SUPPLY
Category
A
Valid to
2027-12-10
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

28 sole-project associations and 3 joint-project associations. 6 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱1,206,281,486.00
Full project values for records naming only this party
Joint-project associated budget
₱361,244,846.22
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

Accountability evidence timeline

Official restriction record

expired restriction

What the record says: GPPB reports a restriction connected to Rehabilitation of the OVPD Offices at Vidal Tan Hall by University of the Philippines - Diliman Campus.

Identity evidence: Exact normalized name in the DPWH record and current PCAB snapshot, PCAB 37325.

Open official GPPB portal
Open the contractor accountability desk

Review leads

Signals associated with this contractor identity

  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD CONTROL WALL ALONG BANKS OF CREEKS, DEL MUNDO, BRGY. 167, CALOOCAN CITY

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF FLOOD CONTROL WALL ALONG BANKS OF CREEK, NORTH OLYMPUS, BRGY. 172, CALOOCAN CITY

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 175, CALOOCAN CITY (PHASE 2)

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF PUP ACADEMIC BUILDING (PHASE 4), CALOOCAN CITY CAMPUS, CALOOCAN CITY

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONSTRUCTION OF COMELEC BUILDING, PHASE II, CALOOCAN CITY

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONSTRUCTION OF ROAD AND DRAINAGE ALONG MAGNOLIA ROAD, BRGY. 174 (PHASE 3), CALOOCAN CITY

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

No published concentration group lists this contractor as the leading recorded party.