Official DPWH delivery record

FY 2024 · Contract 24C00513

BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN(PHASE 5)

Region III, Region III

Recorded project budget
₱98,998,665.62
Snapshot value, not proof of payment
Status / progress
Completed / 100.0%
Reported by the source record
Things to check
1
Questions to verify, not findings

Project details

Fields in the archived DPWH record

Original publisher
Department of Public Works and Highways
Accessed through
BetterGov DPWH dataset and API
Processed and published by
Busisi, built and maintained by Auva Labs
Category
Flood Control and Drainage
Source status
Completed
Reported progress
100.0%
Start date
2024-06-19
Completion date
2025-02-20
Coordinates
15.1605, 121.0423
Satellite image field
Not present in source record
Recorded contractor
TOPNOTCH CATALYST BUILDERS INC. (34061) / ONE FRAME CONSTRUCTION INC. (57070)
Source of funds
Regular Infra - GAA 2024 SSP
Normalized family
family:1b4e626ee6bdb1045d935f4ca33dd4aac828f297362a201ca8f25154e6230147
Artifact SHA-256
5b411cf3f112fabd…

Congressional context

No exact office attribution available

The listed office did not match a published office-to-district mapping.

Project image evidence

Image coverage review not yet recorded

No reconciled project-image review is available for this contract.

A missing image review is not evidence that no project photos exist.

Traceability

Evidence by public-money stage

  1. 01AppropriationRelated GAA source row available
  2. 02ProcurementNo exact artifact located
  3. 03AwardNot established by acquired evidence
  4. 04ImplementationDPWH delivery record available
  5. 05Inspection and acceptanceNot available in acquired procurement evidence
  6. 06Release, obligation and paymentNot available in the acquired records
  7. 07COA project observationNo reviewed project-level match located

Procurement timeline

Coverage review not yet recorded

This dossier has not passed the separate procurement evidence review.

Open the procurement evidence desk

Document acquisition

Contract evidence checklist

No lifecycle document checklist is available for this dossier.

Contract outcome pack

No cross-source outcome review available

Comparable procurement and delivery evidence has not been acquired for this dossier.

Contractor identities

Parties stated in the project record

PCAB 34061

TOPNOTCH CATALYST BUILDERS INC.

147 archived project associations · ₱11,846,761,183.47

Open contractor activity

Things that need checking

Questions raised by this record

  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: The record is completed but the snapshot reports no satellite image.

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged

COA audit evidence

Coverage review not yet recorded

This dossier has not yet passed the separate COA catalogue review.

Open the COA audit evidence desk

Related delivery history

Other records sharing the family identity

  • FY 2024 · 24C00512BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. TARTARO, SAN MIGUEL, BULACAN (PHASE 1)Region III, Region III
    ₱98,999,298.67Open record
  • FY 2024 · 24C00523BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. TARTARO, SAN MIGUEL, BULACAN (PHASE 4)Region III, Region III
    ₱98,999,222.42Open record
  • FY 2024 · 24C00522BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 3)Region III, Region III
    ₱98,998,907.55Open record
  • FY 2024 · 24C00524BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 2)Region III, Region III
    ₱97,519,697.55Open record

Contract acquisition evidence

Exact structured identifier

Accepted secondary rows
1
Quarantined secondary rows
0
Last reconciled
2026-11-03
structured exact

ITB and Bid Docs for Contract ID No. 24C00513 - Basic Infrastructure Program - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Flood Mitigation Struct

TOPNOTCH CATALYST BUILDERS INC. / ONE FRAME CONSTRUCTION INC. - JOINT VENTURE · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III

Contract amount
₱97,511,540.78
Award date
2024-06-06
Status
active
Source row SHA-256
dc545013f3a52db4…
Archived mirror SHA-256
9bfa9e7cbf5041dc…
Archived mirror revision
b98de579579e8c7e…
DPWH universe SHA-256
5b411cf3f112fabd…

Provenance

Identifiers and archived source fingerprints

Original publisher
Department of Public Works and Highways
Accessed through
BetterGov public datasets and APIs
Contract ID
24C00513
Artifact SHA-256
5b411cf3f112fabd…