FY 2025 · Contract 25FK0035

CLUSTER VII-CONVERGENCE AND SPECIAL SUPPORT (CSSP)-CONSTRUCTION/REHAB. OF WATER SUPPLY/SEPTAGE/ AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONST. OF RAIN WATER COLLECTOR-CONST. OF RAINWATER COLLECTOR-SYSTEM,SORSOGON 1.) PATRICIA JESALVA DELGAD

Sorsogon DEO, Region V

Recorded project budget
₱2,540,586.20
Value in this dated record, not proof of payment
Status / progress
On-Going / 100.0%
Reported by the source record
Things to check
1
Questions to verify, not findings

Project details

What the official project record says

Published by
Department of Public Works and Highways
Data accessed through
BetterGov DPWH dataset and API
Category
Water Provision and Storage
Source status
On-Going
Reported progress
100.0%
Start date
2025-05-28
Completion date
Not stated
Coordinates
13.0223909, 124.0289528
Satellite image field
Not present in source record
Recorded contractor
CHEEREL CONSTRUCTION & SUPPLY (40242)
Source of funds
Regular Infra - GAA 2025 LS Itemization
Related project group
family:3b4e1c1279825d1f07b4f2c99d9975b7173fc157284623c31cf4e35f248badaa
Saved-file check code
5b411cf3f112fabd…

Office-linked congressional context

Sorsogon DEO

  • Sorsogon, 1st DistrictEscudero, Bernadette G.

District context is inferred only from the listed DPWH office. It does not show who requested, sponsored, controlled, or is responsible for a project or amount.

Project image evidence

Image review not yet recorded

No checked project-image review is available for this contract.

A missing image review is not evidence that no project photos exist.

Traceability

Evidence by public-money stage

  1. 01AppropriationNo exact appropriation link established
  2. 02ProcurementNo exact document located
  3. 03AwardNot established by the available evidence
  4. 04ImplementationDPWH delivery record available
  5. 05Inspection and acceptanceNot available in the procurement evidence Busisi has
  6. 06Release, obligation and paymentNot available in the records Busisi has
  7. 07COA project observationNo reviewed project-level match located

Procurement timeline

Review not yet recorded

This project page has not passed the separate procurement evidence review.

Open the procurement evidence page

Document checks

Contract document checklist

No contract document checklist is available for this project.

Contract outcome review

No comparison between procurement and delivery records is available

Busisi does not yet have comparable procurement and delivery evidence for this project page.

Contractor identities

Parties stated in the project record

Things that need checking

Questions raised by this record

  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: Status is On-Going; reported progress is 100.0%.

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged

COA audit evidence

Review not yet recorded

This project page has not yet passed the separate COA report review.

Open the COA audit evidence page

Related delivery history

Other records sharing the family identity

No related delivery records were found in the same project group.

Contract match check

Multiple exact source rows

Accepted secondary rows
30
Conflicting secondary rows held back
0
Last checked
2026-11-03
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
a728830c0950fece…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
8f5af82041033710…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
fdc8fd3782311608…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
89548644f20939f6…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
fcfeda87af5088fd…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
c8663bad12013b76…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
a42e8f5dbd0b18e3…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
b014b20c05516056…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
71f40e88a67397c7…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
1316b86e80dc91c5…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
20d3a621e021a7ec…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
c21387cda15a89e6…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
866245a1e788bd6c…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
b193e7a58a40d137…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
1313bc5b36052b3e…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
6ef92589754582a5…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
b4fccd5a5f71a0c6…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
18acad05356f2e69…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
e33e2bdf1c2a28a7…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
a8b178eb5bcf149e…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
6cdcdf62b2361311…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
46cbe7e891eb880a…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
c83a4a9cfbb52aff…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
0a7bd7d0acf6a4a6…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
2ee4b74bc196700f…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
d642f6699252a822…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
d33723ac60214283…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
8e051dc2e612844a…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
ad49c880ce652c69…
title exact

25FK0035-Cluster VII-Convergence and Special Support (CSSP)-Construction/Rehab. Of Water Supply/Septage/ and Sewerage/Rain Water Collectors-Water Supply System-Const. Of Rain Water Collector-Const. of

CHEEREL CONSTRUCTION & SUPPLY · DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SORSOGON 1ST DEO

Contract amount
₱2,540,586.20
Award date
2025-05-13
Status
active
Source row SHA-256
eef9cac3e094d131…
Saved mirror file check code
9bfa9e7cbf5041dc…
Saved mirror version check code
b98de579579e8c7e…
DPWH universe SHA-256
5b411cf3f112fabd…

Sources and checks

Where this information came from

Official information published by
Department of Public Works and Highways
Data accessed through
BetterGov public datasets and APIs
Contract number
25FK0035
Saved-file check code
5b411cf3f112fabd…