We do not have enough information yet · Contract 24C00108
The record says completed, but this source has no satellite image
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (DOWNSTREAM), SAN MIGUEL, BULACAN
- Recorded project budget
- ₱48,249,217.60
- Status / progress
- Completed / 100.0%
- Location
- Region III, Region III
Why Busisi flagged this
What we noticed
The record is completed but the snapshot reports no satellite image.
Why check it: A listed image field is missing from the acquired record for a completed project.
What to check next: Check project images, inspection records, and completion documents.
Technical details
Absence from this field is not proof that implementation evidence does not exist.
- Rule code
- completed_without_satellite_image
- Snapshot fingerprint
5b411cf3f112fabd…
Congressional context
No exact office attribution available
The listed office did not match a published office-to-district mapping.
Recorded contractor identities
Every party stated in the project record
ADSL CONSTRUCTION & TRADING
92 archived project associations · ₱5,974,371,380.52
Open contractor activityOther things to check
1 other flag on this contract
- The recorded place may not matchSeveral projects use the same coordinates
What we noticed: Coordinate 15.2148975, 120.9826909 is shared by: 24C00108, 24C00109.
What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.
See why this was flagged