Archived contractor activity

Recorded PCAB ID 48245

ADSL CONSTRUCTION & TRADING

Project associations in the acquired DPWH snapshot, FY 2024 to FY 2025.

Project associations
92
Associations, not necessarily unique completed works
Associated project budget
₱5,974,371,380.52
Not revenue, payment, or contract value received
Joint-project associations
6

Recorded status mix

Projects by source status

Completed
20
Ongoing
63
Terminated
0

PCAB verification snapshot

current regular

Listed name
ADSL CONSTRUCTION & TRADING
Category
A
Valid to
2027-07-15
Verify in the current PCAB table

Recorded project ledger

Projects associated with this recorded identity

86 sole-project associations and 6 joint-project associations. 30 project associations currently have at least one deterministic review signal.

Sole-project associated budget
₱4,980,621,634.28
Full project values for records naming only this party
Joint-project associated budget
₱993,749,746.24
Full project values, not an allocation to this party

Loading structured project associations...

Contractor accountability

No strongly matched accountability event is published

A missing event is not clearance. Name-only and unmatched records remain quarantined and are not shown.

Review leads

Signals associated with this contractor identity

  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONSTRUCTION OF BY-PASS AND DIVERSION ROADTAYABAS BYPASS ROAD, PACKAGE 1, QUEZON

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, MAHARLIKA HIGHWAY SECTION, SAN RAFAEL, BULACAN

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. TUKOD, SAN RAFEL, BULAC

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: FLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: FLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED LIGHTS INSTALLATION AND APPLICATION SAN ILDEFONSO SAN RAFAEL DAANG MAHARLIKA HIGHWAY, BULACAN SEGMENT 2

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • We do not have enough information yetThe project has no usable coordinates

    What we noticed: CONVERGENCE AND SPECIAL SUPORT PROGRAM - BASIC INFRA. PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CALASAG ROAD, BRGY. CALASAG, SAN ILDEFONSO, BULACAN

    What this does not prove: Missing coordinates do not prove that the project is missing.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CLUSTER 7: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABUSAO, CAMARINES SUR

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CLUSTER 3: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, DEL GALLEGO, CAMARINES SUR

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CLUSTER 11: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, RAGAY, CAMARINES SUR

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 6, SAN ILDEFON

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 7, SAN ILDEFON

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CTRL. STRUCTURE ALONG ANYATAM-MAPANIQUE CREEK,PHASE 9,SAN ILDEFONSO,BUL.

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONSTRUCTION OF SLOPE PROTECTION PACKAGE 16 AT BOTOLAN-CAPAZ RD., BOTOLAN, ZAMBALES

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BARANGAY SIBUL, SAN MIGUEL, BULACAN, PACKAGE IX

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BARANGAY SIBUL, SAN MIGUEL, BULACAN, PACKAGE IX

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE VI), BARANGAY BASUIT, SAN ILDEFONSO, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchThe coordinates and place name may not agree

    What we noticed: CONVERGENCE & SPECIAL SUPPORT PROG-SUST INFRAS. PROJS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST OF SLOPE PROTECTION ALONG MALANGAAN RIVER (PACKAGE D), BRGY CAMACHILE,DONA REMEDIOS TRINIDAD,BUL

    What this does not prove: Office and project labels can differ from map boundaries. This does not prove a false location.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: CONVERGENCE & SPECIAL SUPPORT PROG-SUST INFRAS. PROJS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST OF SLOPE PROTECTION ALONG MALANGAAN RIVER (PACKAGE D), BRGY CAMACHILE,DONA REMEDIOS TRINIDAD,BUL

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE ALONG MADLUM RIVER (DOWNSTREAM) SITIO BALINGCUPANG,BRGY. BIAK NA BATO, SAN MIGUEL, BUL

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (DOWNSTREAM), SAN MIGUEL, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (DOWNSTREAM), SAN MIGUEL, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (UPSTREAM), SAN MIGUEL, BUL

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUCATION FACILITIES FUND-CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN PULONG SAMPALOC ES, DONA REMEDIOS TRINIDAD, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM- BIP-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING ( CLASSROOM BUILDING FOR JUNIOR & SENIOR HIGHSCHOOL LEARNERS),SAN MIGUEL,BULACAN

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONST. OF ELEM. AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUC. FACILITIES FUND:CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BLDG. IN PULONG SAMPALOC ELEM. SCHOOL, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BUL.

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA. PROGRAM-BIP-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BLDG. BAYABAS ELEMENTARY SCHOOL,BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: CONCRETING OF BRGY. SANTA BARBARA TO BRGY. DIRITA FMR, BRGY. SANTA BARBARA AND BRGY. DIRITA, IBA, ZAMBALES

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • The record disagrees with itselfThe project says ongoing, but progress says 100%

    What we noticed: BASIC INFRASTRUCTURE PROGRAM-BIP-PUBLIC WATER SUPPLY SYSTEM-CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY KALAWAKAN, DONA REMEDIOS TRINIDAD, BULACAN

    What this does not prove: This mismatch does not prove that the project is unfinished or that anyone did something wrong.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: BASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,SITIO MADLUM,BARANGAY BIAK-NA-BATO, SAN MIGUEL, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: BASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,SITIO MADLUM,BARANGAY BIAK-NA-BATO, SAN MIGUEL, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged
  • We do not have enough information yetThe record says completed, but this source has no satellite image

    What we noticed: BASIC INFRATRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,BRGY. BIAK-NA-BATO,SAN MIGUEL, BULACAN

    What this does not prove: A missing image does not prove that work was not completed.

    See why this was flagged
  • The recorded place may not matchSeveral projects use the same coordinates

    What we noticed: BASIC INFRATRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,BRGY. BIAK-NA-BATO,SAN MIGUEL, BULACAN

    What this does not prove: Projects can share a site, entrance, office, or map point. Reuse does not prove duplication.

    See why this was flagged

Concentration context

Groups where this was the leading recorded party

Bulacan 3rd DEO14.0% of contractor-party associations · FY 2025
Region III5.1% of contractor-party associations · FY 2024
Bulacan 3rd DEO14.0% of contractor-party associations · FY all years
Region III4.3% of contractor-party associations · FY all years