Public value evidence layer
What evidence does each project still need?
Busisi has opened a bounded evidence queue for 43 multipurpose-building records. Each entry separates what the current source reports from the documents still needed to judge need, location, design, cost, delivery, and actual use.
Direct answer
No queued project is ready for a complete value judgment.
The delivery snapshot provides useful project identifiers, descriptions, recorded budgets, source statuses, office labels, and coordinates. It does not provide the complete planning, engineering, procurement, payment, acceptance, and utilization evidence required for a final conclusion.
Five evidence gates
Every project is checked against the same questions.
A partial state means the source contains some useful fields. It does not mean the gate has passed.
Project and facility identity
Is this a distinct facility, another phase, a repair, or a replacement?
- Verified facility or asset identifier
- Parcel and ownership record
- Prior and related project records
Need and intended public use
What public need will this project address, and who will use it?
- Needs assessment and named public function
- Catchment population or intended users
- Nearby equivalent facilities and utilization
Location and site suitability
Is the verified site appropriate and safe for the intended use?
- Verified parcel and project coordinates
- Official hazard assessment and ground validation
- Access, utilities, drainage, and right-of-way evidence
Design, capacity, and accessibility
Does the design fit the intended public function?
- Plans, floor area, capacity, and specifications
- Structural, climate, sanitation, and accessibility review
- Design approval and professional accountability
Cost, delivery, and actual use
Was the project fairly procured, delivered, accepted, and used?
- Bill of quantities and comparable unit costs
- Award, variations, payments, inspection, and acceptance
- Actual utilization and maintenance after completion
Project evidence queue
Open a record to see its evidence state.
The queue lists all 43 selected records. Contract descriptions, amounts, statuses, office labels, coordinates, and image fields remain source-reported until checked against official project documents.
24DD0136CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, COMPLETION OF MULTI-PURPOSE BUILDING AND SITE FACILITIES AT BARANGAY DAGATAN, SAN JOSE, BATANGAS₱96,030,000.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Batangas 4th DEO
- Region
- Region IV-A
- Source coordinates
- 13.868447, 121.103744
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23DD0312 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24CD0251CONSTRUCTION OF MULTI - PURPOSE BUILDING (GAD BUILDING), BARANGAY POBLACION, SAN JOSE DEL MONTE, BULACAN₱96,015,095.30 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Bulacan 2nd DEO
- Region
- Region III
- Source coordinates
- 14.812800, 121.044000
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24CD0188 (2024), 24CD0278 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25OB0457CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ST. JOSEPH, SAN JUAN CITY (PHASE XIV)₱58,184,184.30 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Metro Manila 1st DEO
- Region
- National Capital Region
- Source coordinates
- 14.603589, 121.031836
- Source image field
- Not reported
Related completed records at the exact source coordinate: 25OB0106 (2025). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24EE0129PACKAGE IV-CONSTRUCTION OF MULTI-PURPOSE BUILDING & DOJ BUILDING:1. BRGY. MENDOZA, ROXAS2. BRGY. CASIAN, TAYTAY3. PALAWAN STATE UNIVERSITY LINAPACAN CAMPUS, LINAPACAN4. BARANGAY TURDA, CORON5. PALAWAN STATE UNIVERSITY TAYTAY CAMPUS, TAYTAY6. B₱56,858,017.10 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Palawan 1st DEO
- Region
- Region IV-B
- Source coordinates
- 10.469286, 119.339872
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24EE0030 (2024), 24EE0066 (2024), 24EE0123 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24DD0174CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, IMPROVEMENT OF MULTI-PURPOSE BUILDING AND SITE FACILITIES, SAN JOSE, BATANGAS₱48,015,000.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Batangas 4th DEO
- Region
- Region IV-A
- Source coordinates
- 13.868447, 121.103744
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23DD0312 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25AI0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (CRISIS MANAGEMENT BUILDING) TUMANA WEST, ROSALES, PANGASINAN₱43,226,030.40 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Pangasinan 3rd DEO
- Region
- Region I
- Source coordinates
- 15.999667, 120.739513
- Source image field
- Reported available
Related completed records at the exact source coordinate: 22AI0169 (2022). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24KE0087CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALBAGON, MAMBAJAO, CAMIGUIN₱29,499,237.63 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Camiguin DEO
- Region
- Region X
- Source coordinates
- 9.245293, 124.726853
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24KE0088 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24DD0204CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION B, ROSARIO, BATANGAS₱28,813,065.49 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Batangas 4th DEO
- Region
- Region IV-A
- Source coordinates
- 13.846524, 121.207714
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24DD0207 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24CB0084CONSTRUCTION OF MULTI-PURPOSE BUILDING (TOURISM CENTER), BRGY. BAGONG SILANG, BALANGA CITY, BATAAN (PHASE 5)₱24,168,183.96 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Bataan 2nd DEO
- Region
- Region III
- Source coordinates
- 14.677861, 120.517944
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24CB0085 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25ME0113CONSTRUCTION OF MULTI-PURPOSE BUILDING, (CULTURAL AND TOURISM CENTER-PHASE II), CAPITOL COMPOUND, ALABEL, SARANGANI PROVINCE₱19,794,972.27 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Sarangani DEO
- Region
- Region XII
- Source coordinates
- 6.100206, 125.275100
- Source image field
- Not reported
Related completed records at the exact source coordinate: 25ME0067 (2025). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24GH0185REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), ESTANCIA, ILOILO₱14,701,911.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Iloilo 3rd DEO
- Region
- Region VI
- Source coordinates
- 11.456840, 123.151100
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24GH0168 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24AI0046CONSTRUCTION OF MULTI-PURPOSE BUILDING AT POBLACION, BINALONAN, PANGASINAN₱14,696,271.31 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Pangasinan 3rd DEO
- Region
- Region I
- Source coordinates
- 16.043605, 120.593487
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24AI0054 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24CB0081CONSTRUCTION OF MULTI-PURPOSE BUILDING, BATAAN TOURISM PARK, BRGY. BAGONG SILANG, BALANGA CITY, BATAAN (PHASE 5)₱14,514,164.42 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Bataan 2nd DEO
- Region
- Region III
- Source coordinates
- 14.677861, 120.517944
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24CB0085 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24OG0076CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY UGONG NORTE, PHASE II QUEZON CITY₱12,479,620.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Quezon City 2nd DEO
- Region
- National Capital Region
- Source coordinates
- 14.597072, 121.075414
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23OG0098 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24EF0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BANGCALAAN, BALABAC, PALAWAN₱9,897,999.77 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Palawan 2nd DEO
- Region
- Region IV-B
- Source coordinates
- 8.744911, 117.456044
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24EF0067 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24IH0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DATAG, LAVEZARES, NORTHERN SAMAR₱9,891,658.84 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Northern Samar 1st DEO
- Region
- Region VIII
- Source coordinates
- 12.516228, 124.353754
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24IH0006 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25OC0009CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT CORONADO STREET (PHASE 3), BARANGAY GUADALUPE VIEJO,MAKATI CITY, METRO MANILA₱9,701,607.46 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Metro Manila 2nd DEO
- Region
- National Capital Region
- Source coordinates
- 14.564857, 121.041302
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23OC0021 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24EE0090CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CULASIAN, DUMARAN, PALAWAN₱9,644,838.75 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Palawan 1st DEO
- Region
- Region IV-B
- Source coordinates
- 10.469286, 119.339872
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24EE0030 (2024), 24EE0066 (2024), 24EE0123 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24CB0080CONSTRUCTION OF MULTI-PURPOSE BUILDING (TOURISM CENTER), BRGY. BAGONG SILANG, BALANGA CITY, BATAAN₱9,564,590.99 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Bataan 2nd DEO
- Region
- Region III
- Source coordinates
- 14.677861, 120.517944
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24CB0085 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25AI0083CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY SANTO NIÑO, BINALONAN, PANGASINAN₱7,349,649.55 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Pangasinan 3rd DEO
- Region
- Region I
- Source coordinates
- 16.176102, 120.570584
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23AI0217 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25AI0081CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY CILI, BINALONAN, PANGASINAN₱7,349,126.77 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Pangasinan 3rd DEO
- Region
- Region I
- Source coordinates
- 16.176102, 120.570584
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23AI0217 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25AI0166CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN OFFICE), BARANGAY SUMABNIT, BINALONAN, PANGASINAN₱7,201,563.93 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Pangasinan 3rd DEO
- Region
- Region I
- Source coordinates
- 16.176102, 120.570584
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23AI0217 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24CC0442CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TIAONG, GUIGUINTO, BULACAN₱6,791,348.37 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Bulacan 1st DEO
- Region
- Region III
- Source coordinates
- 14.842803, 120.893194
- Source image field
- Not reported
Related completed records at the exact source coordinate: 24CC0360 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24DD0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING IN TAYSAN, BATANGAS₱6,722,375.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Batangas 4th DEO
- Region
- Region IV-A
- Source coordinates
- 13.753631, 121.243707
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24DD0014 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25GO0134CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MANSILINGAN, BACOLOD CITY, NEGROS OCCIDENTAL₱6,405,000.00 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Bacolod City DEO
- Region
- Negros Island Region
- Source coordinates
- 10.589128, 122.979283
- Source image field
- Reported available
Related completed records at the exact source coordinate: 25GO0064 (2025). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24IE0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TABING, TABANGO, LEYTE₱4,849,613.59 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Leyte 3rd DEO
- Region
- Region VIII
- Source coordinates
- 11.315415, 124.384640
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24IE0041 (2024), 24IE0087 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24PA0105CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY DALIT, PILAR, ABRA₱4,727,322.02 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Abra DEO
- Region
- Cordillera Administrative Region
- Source coordinates
- 17.351119, 120.565811
- Source image field
- Reported available
Related completed records at the exact source coordinate: 21PA0056 (2021). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24PA0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SAN JOSE SUR, MANABO, ABRA₱4,706,352.51 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Abra DEO
- Region
- Cordillera Administrative Region
- Source coordinates
- 17.429128, 120.705089
- Source image field
- Reported available
Related completed records at the exact source coordinate: 23PA0076 (2023). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier24PA0216CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), DALIT NATIONAL HIGH SCHOOL, PILAR, ABRA₱4,703,579.55 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Abra DEO
- Region
- Cordillera Administrative Region
- Source coordinates
- 17.351119, 120.565811
- Source image field
- Reported available
Related completed records at the exact source coordinate: 21PA0056 (2021). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25OD0267CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA REFORM III (PHASE 2), BRGY. 167, CALOOCAN CITY₱3,906,260.15 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Metro Manila 3rd DEO
- Region
- National Capital Region
- Source coordinates
- 14.735057, 121.013254
- Source image field
- Reported available
Related completed records at the exact source coordinate: 25OD0260 (2025). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25DK0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CABUNGALUNAN, BURDEOS, QUEZON₱2,470,465.82 · Exact-coordinate history
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Quezon 1st DEO
- Region
- Region IV-A
- Source coordinates
- 14.952549, 121.996545
- Source image field
- Reported available
Related completed records at the exact source coordinate: 24DK0114 (2024). This can describe a phase, nearby work, coordinate reuse, or a source error.
Open the project dossier25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR₱482,199,570.61 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2025
- Recorded office
- Region VIII
- Region
- Region VIII
- Source coordinates
- 12.087957, 124.553693
- Source image field
- Not reported
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24F00361CLUSTER XXVI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVI-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIV₱343,033,382.02 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region V
- Region
- Region V
- Source coordinates
- 13.692000, 123.463292
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24F00327CLUSTER XXVII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENT₱343,029,215.94 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region V
- Region
- Region V
- Source coordinates
- 14.141781, 122.877411
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE₱339,286,018.07 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region V
- Region
- Region V
- Source coordinates
- 12.976321, 123.808304
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24H00046CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL HALL), POBLACION, DUMANJUG, CEBU₱313,629,919.82 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region VII
- Region
- Region VII
- Source coordinates
- 10.059397, 123.442789
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24OD0280CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAON, VEINTE REALES, VALENZUELA CITY (SHFC)₱292,243,645.70 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Metro Manila 3rd DEO
- Region
- National Capital Region
- Source coordinates
- 14.716319, 120.966798
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24D00233CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), BARANGAY MAITIM II EAST, TAGAYTAY CITY, CAVITE (PHASE 9)₱291,060,758.37 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region IV-A
- Region
- Region IV-A
- Source coordinates
- 14.122299, 120.957898
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24A00359BASIC INFRASTRUCTURE PROGRAM, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CAPITOL EXTENSION), LAOAG CITY₱290,927,375.49 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region I
- Region
- Region I
- Source coordinates
- 18.196647, 120.593122
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24I00328BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BAGONG PILIPINAS SERBISYO CENTER), ALANGALANG, LEYTE₱247,395,608.52 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region VIII
- Region
- Region VIII
- Source coordinates
- 11.209322, 124.847571
- Source image field
- Not reported
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24OD0281CONSTRUCTION OF MULTI-PURPOSE BUILDING, (DEPED BUILDING) MALINTA, VALENZUELA CITY₱219,407,067.94 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Metro Manila 3rd DEO
- Region
- National Capital Region
- Source coordinates
- 14.692586, 120.967744
- Source image field
- Reported available
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24FI0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY₱197,998,994.37 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Masbate 2nd DEO
- Region
- Region V
- Source coordinates
- 12.369474, 123.624207
- Source image field
- Not reported
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossier24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE₱197,899,468.14 · Largest recorded budget
- Source status
- On-Going
- Fiscal year
- 2024
- Recorded office
- Region VIII
- Region
- Region VIII
- Source coordinates
- 11.049978, 125.019940
- Source image field
- Not reported
No exact-coordinate history lead selected this record. Its large recorded amount is the reason it entered this first queue.
Open the project dossierPublication boundary
Missing evidence is not proof that a project failed.
Selection is not suspicion. The queue is selected from exact-coordinate history and the largest active recorded budgets. It is not a representative sample, risk score, accusation, engineering opinion, or finding of wrongdoing.
Machine-readable evidence
The public page and API use the same authenticated package.
Every candidate, gate state, selection reason, source, limitation, and package file is available for independent inspection.
- Package
4136d509893112797abbc3f1dd9931fd017276ade6ded8fdfc303d527e98cc4d- Method
mpb-public-value-evidence-v1